COBIN
CONTRACTORS
For Main Contractors & Developers

DRY LINING,
PARTITIONS &
DECORATION.

Cobin Contractors supplies dry lining, metal stud partition and commercial decoration packages directly to main contractors and developers across Yorkshire and the wider UK — first-fix through to final finish, delivered by CSCS-qualified site teams.

Cover

£5 Million Public Liability

Fully insured for active construction sites and occupied buildings.

Labour

CSCS-Qualified Operatives

Teams scalable from phased works to large-scale developments.

Docs

RAMS Provided Every Job

Full site documentation issued ahead of mobilisation.

Public Liability
Insurance Cover
£ 1 M
CSCS-Qualified
Site Operatives
1 %
Scalable
Teams — Phased Works to Large Developments
Full
RAMS & Site
Documentation Provided
CSCS-Qualified Operatives
£5 Million Public Liability
RAMS & Site Documentation
Yorkshire & UK-Wide Coverage
Programme-Focused Delivery
what we do

DRY LINING, PARTITIONS
AND COMMERCIAL DECORATION

Cobin Contractors specialises in three trades for main contractors and developers: metal stud partitions, dry lining, and commercial decoration. We work directly to programme dates set by site management, coordinating with other trades on active construction sites, refurbishment projects and fast-paced commercial fit-outs.
Every package is available on a full supply and installation basis, labour-only against your own supply chain, or full turnkey from first fix through to final finish.
01
Partitions
Metal Track & Stud Partitions
Full internal partition layouts built to drawing, including fire-rated and acoustic specifications.
02
Dry Lining
Dry Lining, Plasterboard & Ceilings
Wall and ceiling boarding including moisture-resistant and fire-rated board specifications.
03
Decoration
Commercial Painting & Decorating
Airless spray application and dustless sanding for fast, clean finishing in occupied and live-trading environments.
experienced commercial teams

BUILT FOR
LIVE SITES

Our operatives are experienced in working on active construction sites, refurbishment projects, new-build developments and fast-paced commercial fit-outs, including occupied retail and hospitality environments where out-of-hours and phased working is required.
We understand the importance of programme dates, site coordination, quality control and maintaining clear communication with site management throughout every project — attending progress meetings, working to RAMS and site inductions, and reporting progress against the master programme.
Crew sizes are set project by project — a two-person phased snagging visit is resourced the same way as a twenty-strong team on a new-build apartment block, with labour increased at short notice where the programme demands it.

01

Site Induction & RAMS
Every operative inducted and working to project-specific risk assessments and method statements.
02
Programme Coordination
Direct liaison with site management to protect critical path dates across trades.
03
Scalable Labour
Crew sizes flexed up or down at short notice to match phased handover dates.
04
Quality Control
Finish checked at each stage, with snagging closed out ahead of practical completion.
previous project experience

TRUSTED ON
SITE AFTER SITE

Our experience spans automotive, healthcare, education, hospitality and residential-led commercial developments — delivered for main contractors who need a subcontractor that shows up, hits the programme, and finishes to a standard that survives snagging.
Automotive
BMW — Showroom & Workplace Fit-Out
Automotive
BMW — M Lounge & Reception
Interiors
Lounge & Soft Furnishings Refurbishment
Automotive
BMW — Reception & Back Office
Automotive
BMW — Glazed Office Partitioning
Wagamama
BMW
University of Leeds
Hospitals & Healthcare Facilities
Large-Scale Apartment Developments
New-Build Commercial Units
Retail & Hospitality Fit-Outs
Office & Workplace Refurbishments
first fix to final finish

EVERY STAGE,
ONE CONTRACTOR

From metal stud framing through to the final decorative coat, our teams carry each package through in sequence — reducing the number of trades a main contractor needs to coordinate on programme.
01
Track & Stud + Boarding
Partition layouts framed and boarded to drawing, including moisture-resistant board to wet areas.
02
Quotation
Detailed quotation issued, broken down by trade package and phase.
03
Programme & RAMS
RAMS and site documentation issued ahead of mobilisation, aligned to your master programme.
04
Mobilisation
CSCS-qualified operatives inducted and resourced to the agreed crew size.
05
Delivery
Works progressed against programme with regular reporting to site management.
06
Snagging & Handover
Finish checked and snagging closed out ahead of practical completion.
why main contractors choose us

DEPENDABLE ON
PROGRAMME

CSCS-Qualified Teams
Every operative on site holds valid CSCS certification, inducted to your project RAMS before works begin.
£5 Million Public Liability
Fully insured for work on active construction sites and occupied, live-trading buildings.
Scalable Labour
Crew sizes flexed from a two-person snagging visit to a twenty-strong new-build team, at short notice.
Programme-Focused
Direct liaison with site management to protect critical path dates across every trade.
Full Site Documentation
RAMS and method statements issued ahead of mobilisation for every project, every time.
Yorkshire & UK-Wide
Based in Yorkshire and resourced to deliver projects across the wider UK.
coverage

MOBILISED ACROSS
YORKSHIRE & BEYOND

LS1 – LS29

Leeds

Home base for site teams and equipment, covering the city and surrounding boroughs.
HG1 – HG3

Halifax

Commercial fit-out and refurbishment crews mobilised regularly into Halifax.

BD17 · LS29

Huddersfield

Regular commercial and retail fit-out projects
across both towns.
BD · LS · HG · WF

York

Full regional coverage for track and stud, dry lining and decorating packages.
Nationwide

Sheffield

Crews and equipment mobilised outside Sheffield where the programme and scope justify it.

Enquire

Not Listed?

Send your location and programme dates — we’ll confirm whether it’s within reach.
frequently asked questions

COMMON
QUESTIONS

How much does a double storey extension cost in Leeds in 2026?
A typical double storey extension in Leeds can range from around £55,000 to £180,000 depending on size, structure, access, roof design, planning requirements, steelwork and finish level. A medium double storey rear extension often costs between £80,000 and £130,000, while a larger wrap-around double storey extension can cost more. Cobin Contractors provides a fixed written quote after a site survey.
In most cases, yes. Double storey extensions usually require full planning permission because they affect the first floor, roofline, neighbouring properties, overlooking and the external appearance of the home. Cobin Contractors checks your Leeds property during the survey and confirms the correct planning route before work starts.

Most double storey extensions in Leeds take around 12–16 weeks from breaking ground, depending on size, structure, access, weather, roof design and internal specification.

Larger wrap-around double storey extensions or complex structural projects can take longer.

You may need Party Wall notices if the extension involves excavation near a shared boundary, work on a shared wall or structural work close to neighbouring properties.

This is common on semi-detached, terraced and end-terrace homes in Leeds. Cobin Contractors identifies this during the initial survey.

Sometimes, yes. However, a double storey extension causes more disruption than a single storey build because it affects both floors, the roofline, structural openings and internal services.

We explain the likely disruption during the survey so you can plan properly before the build starts.

A well-designed double storey extension can add strong value because it increases both ground-floor living space and first-floor bedroom or bathroom space.

The value depends on your Leeds postcode, property type, added floor area, layout improvement, finish quality and local buyer demand.

Yes. Cobin Contractors handles RSJ installation, goalpost frames, padstones, load-bearing wall removal, structural calculations and Building Control coordination in-house.

You do not need to arrange a separate steel contractor.

Yes. After the free site survey and feasibility review, Cobin Contractors provides a fixed written quote before work begins.

The quote is based on your property, planning route, structural requirements, access, specification and Building Control requirements.

READY TO START
YOUR NEXT PROJECT?

Request a site survey or call us directly to discuss your next dry lining, partition or decoration package.
CSCS-qualified teams · £5m public liability · RAMS provided